09/09 West Hampsted, mounted brass strip on the blue rubber.

oCom 18.09.13 в 14:17

0

10/09 West Hampsted, mounted brass strip on the blue rubber; 2nd delivery; mounted 4 panels (and brackets to them) in the toilets on Ground floor. Placed hinges in the box next to the lift.

oCom 18.09.13 в 14:36

0

11/09 West Hampsted, placed hinges and mounted brass door. Removed and then placed again (hinges were weak); Cut out frames for the little button in the toilet panel.

oCom 18.09.13 в 14:38

0

12/09 West Hampsted, attached the frames to the little button in the toilet panel; mounted Brass on the blue rubber; mounted the large doors; 15:30 drove out to Heathrow and took off 5 large windows.

oCom 18.09.13 в 15:09

0

13/09 Kingston 1.) Did the water heater finish on the top floor (3 times); 2.)Lifted the access panel up (it got in the way of the railing); 3.) портишок in the corner office room; 4.) Did the finish on the walls around the street door and the electricity box (concrete plate).

oCom 18.09.13 в 15:29

0

14/09 West Hampsted, worked with Andrei and Roman, mounted 2 glass doors; adjusted 4 doors; adjusted 8 handles in the bronze doors; worked till 15:00

oCom 18.09.13 в 15:31

0

15/09 The Pharmacy. Worked with Ed to replace the fire stripe and 1 doorcloser.

oCom 18.09.13 в 15:32

0

16/09 Heathrow, mounted the U section for the glass; cut off 3 square bits of metal.

oCom 18.09.13 в 15:33

0

17/09 West Hampsted, mounted the Brass on the blue rubber; mounted and reinforced the frame for the door next to lift #2.

oCom 18.09.13 в 15:35

0

18/09 Kingston, Shut the hole on the ground floor, mounted the concrete board; added 2 small boards on the top floor; Covered the carcass around the lift in the Parking Area. Covered the door with plaster on ground floor; Covered the wall in the long hall (ground floor).

oCom 18.09.13 в 15:37